Head design and research institute for transport

«BOSHTRANSLOYIHA» Joint stock company

(998-71) 255-82-98

23a, Nukus st., 100060, Tashkent

boshtrans@gmail.com

Main facilities of the institute


Combined bridge crossing over Amu-darya river near Tashsaka settlement

Combined bridge crossing over Amu-darya river near Tashsaka settlement from — АО «BOSHTRANSLOYIHA».

Combined bridge crossing over Amu-darya river near Tashsaka settlement

Combined bridge crossing over Amu-darya river near Tashsaka settlement

The project of railway line Navoi – Uchkuduk – Sultanuizdag – Nukus provided for construction of combined bridge crossing over Amu-Darya river in the vicinity of Tashsaka settlement with railway and highway crossings. The project was implemented in 2002. The primary purpose of the bridge crossing over Amu-Darya river consists in improvement of transport service and providing direct transportation and economic links, as well as cultural ties with the other regions of Uzbekistan. The bridge dimensions – 10 x 66 m, the bridge length is 681,1 m, the length of railroad sidetracks – 14,7 km, and the length of approach motor roads – 11,8 km.

Projects

All projects

Useful links



Currency rate


Курсы валют

Weather



Опрос


Нравится ли Вам наш новый сайт?

Total votes: 202

Working mode


Monday - Friday
from 8-30 to 17-30
Dinner
from 12-30 to 13-30


Visit statistics